BIM modelling & model checking
Models checked against the client's requirements before they are submitted, so the review comes from us and not from the client. Modelling itself through partners when you need it.
Where projects lose money
Rejected submissions
A model comes back from the client with a list of naming, parameter and LOD issues. Every round costs a week.
Rules nobody reads
The EIR and the BIM execution plan are long; checks are done by eye, and differently by each modeller.
Data that stops at the drawing
The model looks right but the data behind it is incomplete: fire ratings, classifications, COBie fields, IFC types.
How the work runs
Collect the rules
We turn the EIR, BEP, ISO 19650 and the national standard into a rule set the software can run.
Run the checks
IFC or Revit models are checked rule by rule: naming, parameters, classification, geometry, level of information need.
Fix what can be fixed
Naming, parameters and classification are corrected automatically where it is safe; the rest is listed with the element ID.
Report and re-check
A report an engineer can read, then a re-run after the modelling team has fixed the remaining items.
What this service does not do
- We check and correct models; full modelling production is delivered with partner BIM studios under our coordination.
- Checks are as good as the rules: an incomplete EIR gives an incomplete check, and we say so in the report.
- Geometry errors that need design decisions are listed, not fixed.
What you receive
Compliance report
Pass / fail per rule, counts, element IDs, screenshots where useful. PDF and spreadsheet.
Corrected model
The IFC or Revit file with the automated fixes applied and a change log.
Rule set
Your rules in a reusable form, so the next project starts from the same checks.
Frequently asked
Short answers; the details depend on the project and are agreed in the scope.
Which formats do you check?
IFC 2x3 and IFC 4 for any authoring tool; Revit files natively. Other formats via IFC export.
Do you follow ISO 19650 or the Italian UNI 11337?
Both, and the client's own EIR. The rule set is built from whichever applies to the project.
How long does a check take?
A first run on a typical building model takes one to two working days; re-checks are same-day.
Can this run inside our office?
Yes. The rule set and checks can be installed on your machines so models never leave the office.
Send a model for a first check
Tell us what you are working on. We reply within two working days with what we would do, how long it takes and what it costs.