Construction progress & reporting
See progress from the site itself. Photos, 360° captures and drone flights are compared with the plan and the model; reports and progress claims are drafted from the evidence, not from memory.
Where projects lose money
Reports written at 7 pm
The site manager writes the daily report from memory. It is late, thin and not comparable with yesterday's.
Progress nobody can prove
The payment application says 80%. The client's engineer says 70%. There are no dated photos to settle it.
Issues lost in chat
Problems are photographed and sent in a messaging group, then forgotten. No list, no owner, no closure.
How the work runs
Capture
Phone photos, 360° cameras on a helmet, or a drone flight at agreed intervals. No special hardware to start.
Locate
Each capture is placed on the plan or the model, so the same spot can be compared over time.
Measure
Progress per element and package is estimated from the captures against the schedule; issues are logged with their photo.
Report
The daily or weekly report and the progress claim are drafted from the evidence; the site manager reviews and sends.
What this service does not do
- Progress estimates from images are indicative; quantities for payment are confirmed by the site team.
- Safety detection on cameras is a separate scope with its own legal requirements; we advise on it, we do not install cameras.
- The service needs regular captures: no photos, no report.
What you receive
Progress report
Planned vs. measured per package, with dated captures. Daily or weekly, in your template.
Issue log
Issue, location, photo, owner, status. Exported to your tools.
Evidence pack
The captures organised by date and location, ready for a payment application or a dispute.
Frequently asked
Short answers; the details depend on the project and are agreed in the scope.
What equipment do we need?
A phone is enough to start. A 360° camera (about €500) gives better coverage; drones are used for large sites with a licensed operator.
Does it work without a BIM model?
Yes, with the plan and the schedule. The model improves location and element-level progress.
Who writes the report?
The draft is produced from the evidence; your site manager edits and signs it. The record of what was changed is kept.
Can it feed our payment applications?
Yes. Measured progress and dated evidence are exported in the structure your client requires.
Discuss a site to monitor
Tell us what you are working on. We reply within two working days with what we would do, how long it takes and what it costs.