EdiSightDIGITAL BUILT SOLUTION
Service

Clash detection & BIM coordination

Find the clashes in the model, not on site. Structure, architecture and MEP are checked together, and the thousands of raw hits become a short list of real problems with an owner each.

Clash register (BCF)grouped, prioritised, assigned
Coordination reportper meeting, with status tracking
Rules per disciplinetolerances and clearances agreed
Any authoring toolvia IFC and BCF
The challenge

Where projects lose money

01

Ten thousand clashes

A raw clash run returns thousands of hits. Most are duplicates or irrelevant, and the real ones are buried.

02

Meetings without decisions

Coordination meetings scroll through screenshots. Nobody knows which clash was fixed, which was accepted, which was forgotten.

03

Found on site anyway

A duct through a beam is discovered when the beam is poured. Rework, delay, and an argument about who pays.

What we do

How the work runs

01

Set the rules

Which disciplines, which tolerances, which clearances (maintenance space, fire separation). Agreed with the design team.

02

Run and group

Clashes are detected between every pair of models, then grouped by element and location so one real problem is one item.

03

Prioritise and assign

Each group gets a severity (structural, services, finishes) and an owner. Trivial hits are closed with a reason.

04

Track to closure

The register is issued as BCF; every item has a status and is re-checked at the next model exchange.

What this service does not do

  • We detect, group and track; design changes are made by the discipline that owns the element.
  • A clash check is only as current as the models: we state the model versions checked in every report.
  • Soft clashes (clearances) need the clearance rules from the design team or the operator.
Deliverables

What you receive

01

Clash register

BCF 2.1/3.0 file for Revit, Navisworks, Solibri, BIMcollab; plus a spreadsheet for everyone else.

02

Coordination report

Open, closed and new items per discipline, with screenshots and the decisions taken.

03

Rule set

Tolerances and clearances documented so the next project runs the same way.

Questions

Frequently asked

Short answers; the details depend on the project and are agreed in the scope.

Which tools do you use?

Navisworks, Solibri and open IFC tools, depending on what the team already uses. Results are exchanged as BCF so nobody has to change software.

How often should clash detection run?

At every model exchange, typically weekly during coordination. The first run is the big one; later runs show only what changed.

Can you join our coordination meetings?

Yes. We prepare the register before, present it, and record the decisions in the BCF file.

Do you check against the point cloud too?

Yes, when an as-built survey exists: new services are checked against the existing structure as scanned.