EdiSightDIGITAL BUILT SOLUTION
Service

Quantity take-off & cost information

Quantities that match the model and the bill. We count from the model, compare with the drawings and the bill of quantities, and list every difference so the estimate and the design agree.

Reconciled BoQmodel quantities against the bill, line by line
Difference reportwhat is in the model and not in the bill, and the reverse
Price-list mappingItalian prezziari, client price lists, your own rates
Change trackingquantities between model versions
The challenge

Where projects lose money

01

The bill drifts from the model

The design changes, the bill of quantities does not. The estimate is priced on an old issue.

02

Counting by hand

Quantities are measured from drawings with a scale rule and a spreadsheet. Slow, and nobody can check them.

03

In the model, not in the bill

Elements modelled but never priced; items priced but no longer in the design. Found at the final account.

What we do

How the work runs

01

Prepare the model

Elements are checked for the parameters quantities depend on: classification, material, type, phase.

02

Take off

Quantities are extracted per element and per item code (NTC, UNI, the client's or your own structure).

03

Reconcile

Model quantities are matched to the bill and the price list; every difference above the tolerance is listed with its source.

04

Report and update

The reconciled bill and the difference report are issued; re-run at the next design issue.

What this service does not do

  • We provide quantities and cost information; pricing, mark-ups and the commercial decision stay with the estimator.
  • Quantities depend on model quality: a poorly classified model gives a longer list of unmapped elements, which we report first.
  • Unit rates come from the price list you choose; we do not publish market rates.
Deliverables

What you receive

01

Reconciled bill of quantities

Model quantity, bill quantity, difference and the element IDs behind each line. Spreadsheet and PDF.

02

Difference report

Omissions, extras and mismatches sorted by value, with the drawing or model view that proves each one.

03

Mapping

Element-to-item mapping kept for the project, so later issues are compared automatically.

Questions

Frequently asked

Short answers; the details depend on the project and are agreed in the scope.

Which price lists do you work with?

Italian regional prezziari, client-specific lists and your internal rates. The mapping is yours to keep.

What if the model is not detailed enough?

We report what can and cannot be counted from it, and count the rest from drawings, marked as such.

Can you compare two model versions?

Yes. Quantity changes between issues are listed per element, which is useful for variations and claims.

Do you work with 5D BIM software?

Yes, with the tools you have (e.g. Revit schedules, Navisworks Quantification, PriMus, STR Vision) and with open IFC where you have none.

Send a model and a bill to compare

Tell us what you are working on. We reply within two working days with what we would do, how long it takes and what it costs.

Discuss a project →info@aitown.it